N-10.1
Procedure status
According to the Draft FEP 2023 site N-10.1 will be put out to tender by the BNetzA in 2025. The area is currently under investigated.
Details on the status of the procedure can be found in the following compilation:
Investigation framework
The final scope of the investigation will be determined on the basis of the comments received during the consultation procedure.
Public participation regarding the investigation
Suitability assessment
The suitability of the site is expected to be assessed from 2023 onwards and a strategic environmental assessment will be carried out within this context. The results of the assessment will then be published in draft form and public participation will be carried out in 2024.
Site information
The information on the site will be published by the BNetzA within the scope of the site tendering no later than six months before the bid date on 01 September 2025.